Projects Gallery
Professional installations with attention to detail. Every project is documented, labeled, tested, and handed over with comprehensive as-built packs.
Complete comms room transformation: replaced aging 19" rack, implemented structured cable management, color-coded patch labeling (VLAN-based), and installed horizontal cable management. All 48 ports labeled and documented with port-to-room mapping.
Full Cat6A structured cabling deployment with professional patch panel termination. All cables labeled at both ends (room-based naming), tested to TIA-568 standards, and certified with Fluke DSX-5000. Color-coded by zone: blue (office), yellow (warehouse), red (management).
Professional ceiling-mount AP installation following predictive site survey. All APs positioned per heat-map, mounted with proper cable dressing, and configured for seamless roaming. Post-install validation survey confirmed 98% coverage at -67dBm or better.
After-hours firewall replacement (consumer router → Fortinet FortiGate 60F). Configuration pre-staged and tested in lab, cutover completed in 2-hour maintenance window. Zero downtime for critical patient management system. All rules documented and security policies hardened.
Planned office relocation with complete network cutover. Pre-cabled new site Friday evening, physical move Saturday, network live Sunday 6pm. All phones, PCs, and servers operational Monday 8am. Detailed runbook followed with sign-off at each milestone. Zero data loss.
Established secure site-to-Azure VPN for hybrid cloud access. Configured redundant tunnels with BGP routing, implemented split DNS, and validated connectivity to all Azure VNets. Latency reduced from 150ms (internet) to 8ms (direct VPN path). Monitoring dashboards configured.
Every project includes comprehensive as-built documentation with redacted network diagrams, monitoring dashboards, and detailed configuration records.
Professional network topology diagrams showing logical architecture:
Real-time visibility with configured monitoring platforms:
Every project concludes with a full documentation handover: